Project Completion Certificate (Ground Water)
Scheme ID: 20020579 Name of Scheme: Mustafabad No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 2190 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 04-Feb-2024 Actual Date of Completion (Capex): 31-Oct-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18/135.01 Mustafabad 26.79 83.18
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 30/43 Mustafabad 26.79 83.18
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 150/16 Mustafabad 26.79 83.18
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.03 Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.48 Laying Completed
2 HDPE 90 1.17 Laying Completed
3 HDPE 110 0.26 Laying Completed
4 HDPE 140 0.83 Laying Completed
HSC Connection
Sno. Total Nos.
1 340
Other Details
1.82
0.00
1.81
03-Sep-2026
01-Nov-2026