Project Completion Certificate (Ground Water)
Scheme ID: 20020891 Name of Scheme: Bhakura No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 4202 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 22-May-2023 Actual Date of Completion (Capex): 28-Mar-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well -300X200 12.08/44.46 Bhakura 25.831261 82.722744
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Pump-20HP 900/49.40 Bhakura 25.831261 82.722744
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 250KL/14M Bhakura 25.831249 82.722683
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-9 200 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6 200 0.281
2 HDPE PIPE PN-6 140 0.527
3 HDPE PIPE PN-6 110 0.407
4 HDPE PIPE PN-6 75 2.795
5 HDPE PIPE PN-6 63 12.971
6 HDPE PIPE PN-6 90 1.576
HSC Connection
Sno. Total Nos.
1 793
Other Details
3.53
3.51
3.24
28-Mar-2026
29-Mar-2026