Project Completion Certificate (Ground Water)
Scheme ID: 20021117 Name of Scheme: AUDEDIH WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 3017 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 20-Sep-2023 Actual Date of Completion (Capex): 22-Apr-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Plain Pipe 300mm 95 TW 25.9337933 83.5969013
2 Slotted Pipe 300mm 10 TW 25.9337933 83.5969013
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Solar Submersible Pump 700/48 TW 25.9337933 83.5969013
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Zinc Tank 200/14 OHT 25.9337934 83.5969012
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 125 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 5.775
2 HDPE Pipe PN-6: Class PE-100 75 1.069
3 HDPE Pipe PN-6: Class PE-100 90 0.757
4 HDPE Pipe PN-6: Class PE-100 110 1.17
5 HDPE Pipe PN-6: Class PE-100 140 0.84
6 HDPE Pipe PN-6: Class PE-100 200 0.068
HSC Connection
Sno. Total Nos.
1 407
Other Details
3.07
3.05
2.32
15-Apr-2026
22-Apr-2026