Project Completion Certificate (Ground Water)
Scheme ID: 20021221 Name of Scheme: Semri Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 2604 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 30-Dec-2021 Actual Date of Completion (Capex): 25-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 25.02/142.15 Semri 27.57649 82.48778
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump -1 570 LPM Discharge/ 43 mtr Head Semri 27.57649 82.48778
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175 KL/16 Mtr Semri 27.57649 82.48778
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI, K-7 100 0.010
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 200 0.163
2 HDPE 160 1.290
3 HDPE 140 0.675
4 HDPE 110 1.279
5 HDPE 90 0.487
6 HDPE 75 0.092
7 HDPE 63 2.623
HSC Connection
Sno. Total Nos.
1 521
Other Details
1.93
0.00
2.32
25-Jun-2026
25-Jun-2026