Project Completion Certificate (Ground Water)
Scheme ID: 20021243 Name of Scheme: Mardahwa Kalan Water Supply Scheme No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 3151 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 30-Jun-2023 Actual Date of Completion (Capex): 25-Feb-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 155.82 / 24.14 Madrahwa Kalan 27.5157 82.60589
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump -1 630LPM Discharge/ 41 mtr Head Madrahwa Kalan 27.5157 82.60589
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175KL / 14Mtr Madrahwa Kalan 27.5157 82.60589
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI, K-7 100 0.017
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 160 0.308
2 HDPE 200 0.044
3 HDPE 140 1.509
4 HDPE 110 1.877
5 HDPE 90 0.295
6 HDPE 75 0.120
7 63 63 4.048
HSC Connection
Sno. Total Nos.
1 631
Other Details
2.13
0.00
2.96
25-May-2026
25-May-2026