Project Completion Certificate (Ground Water)
Scheme ID: 20021849 Name of Scheme: Afzalpur Bhau & Jamlpur Dikli Gram Panchayat Water Supply No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 2511 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 21-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 26.03 / 146.78 AFJALPURBAHU AND JAMALPUR DIKLI 29.558187 78.437358
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 550 / 56 AFJALPURBAHU AND JAMALPUR DIKLI 29.558187 78.437358
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150 KL / 12 MTR AFJALPURBAHU AND JAMALPUR DIKLI 29.558187 78.437358
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 150 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 63 5.6733
2 HDPE PIPE 75 0.1493
3 HDPE PIPE 90 0.8096
4 HDPE PIPE 110 0.2432
5 HDPE PIPE 125 0
6 HDPE PIPE 140 0.2028
HSC Connection
Sno. Total Nos.
1 367
Other Details
2.10
0.00
2.17
21-Nov-2025
22-Nov-2025