Scheme ID: 20022805 Name of Scheme: SADARPUR No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 4050 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 24-Feb-2024 Actual Date of Completion (Capex): 04-Dec-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 34 M / 109.59M Sadarpur 28.379584 77.983031
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 790 LPM / 57 M Sadarpur 28.379584 77.983031
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 225 KL / 20 M Sadarpur 28.379532 77.982888
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 150 34.30
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1.05
2 HDPE 75 0.43
3 HDPE 90 0.081
4 HDPE 110 0.38
5 HDPE 125 2.34
6 HDPE 140 0.15
7 HDPE 160 0.27
8 HDPE 180 0.54
HSC Connection
Sno. Total Nos.
1 857
Other Details
2.87
2.78
2.81
31-Mar-2026
01-Apr-2026