Project Completion Certificate (Ground Water)
Scheme ID: 20022818 Name of Scheme: ADHAN No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3591 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 24-Feb-2024 Actual Date of Completion (Capex): 10-Jan-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 23 M/94.73 M Adhan 28.410597 77.742942
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 750 LPM/53 M Adhan 28.410597 77.742942
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 225 KI/16 M Adhan 28.410709 77.742692
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 150 14.50
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7.76
2 HDPE 75 0.88
3 HDPE 90 1.03
4 HDPE 110 0.20
5 HDPE 140 0.18
6 HDPE 160 0.50
7 HDPE 180 0.47
HSC Connection
Sno. Total Nos.
1 809
Other Details
2.62
2.49
2.53
31-Dec-2025
01-Jan-2026