Scheme ID: 20023354 Name of Scheme: IMALIYA JANUBHI GP WSS No. of Villages: 2 No. of Habitation Covered: 0
Total Population Covered: 1976 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2026 Actual Date of Completion (Capex): 15-Sep-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PE 100 PN 6/HDPE 63 3683
2 PE 100 PN 6/HDPE 75 269
3 PE 100 PN 6/HDPE 90 326
4 PE 100 PN 6/HDPE 110 158
HSC Connection
Sno. Total Nos.
Other Details
147.56
141.70
143.37
15-Dec-2025
25-Dec-2025