Project Completion Certificate (Ground Water)
Scheme ID: 20023558 Name of Scheme: DEVKHARI WATER SUPPLY SCHEME No. of Villages: 9 No. of Habitation Covered: 13
Total Population Covered: 2760 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 08-Aug-2023 Actual Date of Completion (Capex): 30-Dec-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Slotted Pipe 200mm 16 TW 25.8766755 83.3676601
2 Plain Pipe 200mm 63.5 TW 25.8766755 83.3676601
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Solar Submersible Pump 600/46 TW 25.8766755 83.3676601
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Zinc Tank 175/12 OHT 25.8766755 83.3676601
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 125 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 14.33
2 HDPE Pipe PN-6: Class PE-100 75 0.47
3 HDPE Pipe PN-6: Class PE-100 90 2.9
4 HDPE Pipe PN-6: Class PE-100 110 0.32
5 HDPE Pipe PN-6: Class PE-100 140 0.55
HSC Connection
Sno. Total Nos.
1 432
Other Details
2.66
2.35
1.92
20-Apr-2025
30-Dec-2025