Project Completion Certificate (Ground Water)
Scheme ID: 20023645 Name of Scheme: Kanjer Heri Village Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1803 Base Year: 2022 Intermediate Year: 2035 Design Year: 2052
Date of Completion (As per Contract): 05-Oct-2025 Actual Date of Completion (Capex): 04-Oct-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.07 Mtr / 111.33 Mtr Kanjerheri 29.5320020 77.35679
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 450 LPM / 62Mtr Kanjerheri 29.5320020 77.35679
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150 KI / 12M Kanjerheri 29.5320020 77.35679
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.l. 15012 0.017
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1.852
2 HDPE 75 0.818
3 HDPE 90 0.396
4 HDPE 110 0.236
5 HDPE 160 0.119
HSC Connection
Sno. Total Nos.
1 340
Other Details
2.12
0.00
0.00
04-Jan-2026
01-Jan-2026