Project Completion Certificate (Ground Water)
Scheme ID: 20023704 Name of Scheme: Kewatli Kalan No. of Villages: 8 No. of Habitation Covered: 20
Total Population Covered: 5840 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 02-Mar-2024 Actual Date of Completion (Capex): 28-May-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well -300X200 20/76.98 Kewatli Kalan 25.965331 82.382627
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Pump-25HP 1250/48 Kewatli Kalan 25.965331 82.382627
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 350KL/14M Kewatli Kalan 25.965337 82.382613
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-9 200 0.016
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6 200 0.234
2 HDPE PIPE PN-6 160 0.646
3 HDPE PIPE PN-6 140 2.509
4 HDPE PIPE PN-6 90 3.218
5 HDPE PIPE PN-6 75 1.682
6 HDPE PIPE PN-6 110 3.045
7 HDPE PIPE PN-6 63 23.3505
HSC Connection
Sno. Total Nos.
1 740
Other Details
4.75
4.69
3.65
28-May-2026
29-May-2026