| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20023841 | Name of Scheme: Naudhna PWS | No. of Villages: 1 | No. of Habitation Covered: 6 |
| Total Population Covered: 3500 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 22-Sep-2023 | Actual Date of Completion (Capex): 03-Aug-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 132.30 MTR/28 MTR | NAUDHANA | 26.664204* | 79.208755* |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 45.01 M^3/ 49 MTR | NAUDHANA | 26.664204* | 79.208755* |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200 KL /16 MTR | NAUDHANA | 26.664204* | 79.208755* |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.040 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 3.170 | |
| 2 | HDPE | 75 | 1.888 | |
| 3 | HDPE | 90 | 2.146 | |
| 4 | HDPE | 110 | 1.302 | |
| 5 | HDPE | 140 | 0.213 | |
| 6 | HDPE | 160 | 1.152 | |
| 7 | HDPE | 180 | 0.082 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 642 |