Project Completion Certificate (Ground Water)
Scheme ID: 20023841 Name of Scheme: Naudhna PWS No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 3500 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 22-Sep-2023 Actual Date of Completion (Capex): 03-Aug-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 132.30 MTR/28 MTR NAUDHANA 26.664204* 79.208755*
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 45.01 M^3/ 49 MTR NAUDHANA 26.664204* 79.208755*
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200 KL /16 MTR NAUDHANA 26.664204* 79.208755*
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.040
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.170
2 HDPE 75 1.888
3 HDPE 90 2.146
4 HDPE 110 1.302
5 HDPE 140 0.213
6 HDPE 160 1.152
7 HDPE 180 0.082
HSC Connection
Sno. Total Nos.
1 642
Other Details
2.13
2.35
2.35
03-Aug-2024
04-Aug-2024