Scheme ID: 20024189 Name of Scheme: Faudipur Multi Village Water Supply Scheme No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 4381 Base Year: 2022 Intermediate Year: 2037 Design Year: 2022
Date of Completion (As per Contract): 31-Dec-2026 Actual Date of Completion (Capex): 30-Jul-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 99/36 Faudipur 82.500355 25.297489
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 56.92 Faudipur 82.500355 25.297489
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT - RCC 275/12 Faudipur 82.500355 25.297489
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 200 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 12.977
2 HDPE 75 1.795
3 HDPE 90 1.998
4 HDPE 110 2.774
5 HDPE 140 2.227
6 HDPE 160 0.394
7 HDPE 200 0.049
HSC Connection
Sno. Total Nos.
1 554
Other Details