| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20024385 | Name of Scheme: Harchandpur Gram Panchayat Water Supply | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 3487 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 06-Jul-2023 | Actual Date of Completion (Capex): 24-Oct-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube Well | 42.42 / 125.62 | Harchandpur | 29.6420704 | 78.182741 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 800 / 55 | Harchandpur | 29.6420704 | 78.182741 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 225 / 12 | Harchandpur | Harchandpur | Harchandpur |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI - K7 | 150 | 0.027 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 6.085 | |
| 2 | HDPE | 75 | 0.286 | |
| 3 | HDPE | 90 | 0.496 | |
| 4 | HDPE | 110 | 0.295 | |
| 5 | HDPE | 125 | 0.362 | |
| 6 | HDPE | 160 | 0.227 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 698 |