Project Completion Certificate (Ground Water)
Scheme ID: 20024466 Name of Scheme: BHUJAHI WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 8
Total Population Covered: 2056 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 19-Mar-2023 Actual Date of Completion (Capex): 23-Dec-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Slotted Pipe 150mm 23.95 TW 26.0030844 83.3443729
2 Plain Pipe 150mm 115.83 TW 26.0030844 83.3443729
3 Housing Pipe 42.02 TW 26.0030844 83.3443729
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Solar Submersible Pump 500/44 TW 26.0030844 83.3443729
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Zinc Tank 100/12 OHT 26.0030844 83.3443729
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 6.25
2 HDPE Pipe PN-6: Class PE-100 90 1.01
3 HDPE Pipe PN-6: Class PE-100 110 0.344
4 HDPE Pipe PN-6: Class PE-100 140 0.055
HSC Connection
Sno. Total Nos.
1 304
Other Details
2.07
1.68
1.68
22-Dec-2025
23-Dec-2025