| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20024466 | Name of Scheme: BHUJAHI WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 8 |
| Total Population Covered: 2056 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 19-Mar-2023 | Actual Date of Completion (Capex): 23-Dec-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Slotted Pipe 150mm | 23.95 | TW | 26.0030844 | 83.3443729 |
| 2 | Plain Pipe 150mm | 115.83 | TW | 26.0030844 | 83.3443729 |
| 3 | Housing Pipe | 42.02 | TW | 26.0030844 | 83.3443729 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Solar Submersible Pump | 500/44 | TW | 26.0030844 | 83.3443729 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Zinc Tank | 100/12 | OHT | 26.0030844 | 83.3443729 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 100 | 0.03 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6: Class PE-100 | 63 | 6.25 | |
| 2 | HDPE Pipe PN-6: Class PE-100 | 90 | 1.01 | |
| 3 | HDPE Pipe PN-6: Class PE-100 | 110 | 0.344 | |
| 4 | HDPE Pipe PN-6: Class PE-100 | 140 | 0.055 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 304 |