Project Completion Certificate (Ground Water)
Scheme ID: 20024698 Name of Scheme: Gopalpur Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 2850 Base Year: 2022 Intermediate Year: 2039 Design Year: 2052
Date of Completion (As per Contract): 17-Mar-2024 Actual Date of Completion (Capex): 25-Mar-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.13/167.52 Gopalpur 27.62197 82.29971
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump -1 590 LPM Discharge/ 43 mtr Head Gopalpur 27.62197 82.29971
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175 KL/16 Mtr Gopalpur 27.62197 82.29971
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI, K-7 100 0.01910
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 200 1.408
2 HDPE 160 0.868
3 HDPE 140 0.794
4 HDPE 110 0.194
5 HDPE 90 0.616
6 HDPE 75 5.941
7 HDPE 63 1.408
HSC Connection
Sno. Total Nos.
1 510
Other Details
1.90
0.00
2.06
25-Jun-2026
25-Jun-2026