Project Completion Certificate (Ground Water)
Scheme ID: 20025500 Name of Scheme: Chhateni No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1900 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 25-Aug-2022 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 21.01/125.86 Chhateni 26.486636 80.035517
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 38.9/64 Chhateni 26.486636 80.035517
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 125/16 Chhateni 26.486636 80.035517
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.019 As per Site
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.288 As per Site
2 HDPE 75 0.332 As per Site
3 HDPE 90 0.688 As per Site
4 HDPE 110 0.840 As per Site
5 HDPE 140 0.107 As per Site
HSC Connection
Sno. Total Nos.
1 302
Other Details
1.62
1.66
1.66
30-Sep-2023
01-Oct-2023