Project Completion Certificate (Ground Water)
Scheme ID: 20025515 Name of Scheme: Teoga No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 3520 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 25-Aug-2022 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 30/135.50 Teoga 26.201742 79.735178
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 48.90/62 Teoga 26.201742 79.735178
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225/16 Teoga 26.201742 79.735178
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.026 As per Site
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.00 As per Site
2 HDPE 75 2.358 As per Site
3 HDPE 90 0.244 As per Site
4 HDPE 110 0.333 As per Site
5 HDPE 125 1.039 As per Site
6 HDPE 140 0.200 As per Site
7 HDPE 160 0.578 As per Site
HSC Connection
Sno. Total Nos.
1 550
Other Details
2.13
2.22
2.22
04-May-2023
07-May-2023