Project Completion Certificate (Ground Water)
Scheme ID: 20025530 Name of Scheme: Sithara Buzurg No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 3260 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 25-Aug-2022 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 30/168.54 Sithara Buzurg 26.294067' 79.797442'
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 32.20/62 Sithara Buzurg 26.294067' 79.797442'
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200/12 Sithara Buzurg 26.294067' 79.797442'
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.026 As per Site
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.215 As per Site
2 HDPE 75 0.34 As per Site
3 HDPE 90 0.173 As per Site
4 HDPE 110 0.491 As per Site
5 HDPE 125 0.825 As per Site
6 HDPE 140 0.033 As per Site
7 HDPE 160 0.060 As per Site
HSC Connection
Sno. Total Nos.
1 580
Other Details
1.91
2.07
2.07
05-Nov-2023
06-Nov-2023