Project Completion Certificate (Ground Water)
Scheme ID: 20025559 Name of Scheme: Tutai Khan No. of Villages: 4 No. of Habitation Covered: 5
Total Population Covered: 3730 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 25-Aug-2022 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 30.05/178.39 Tutai Khan 26.3101733' 79.799153'
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 40.5/66 Tutai Khan 26.3101733' 79.799153'
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225/16 Tutai Khan 26.3101733' 79.799153'
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.023 As per Site
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 8.531 As per Site
2 HDPE 75 0.473 As per Site
3 HDPE 90 0.204 As per Site
4 HDPE 110 1.023 As per Site
5 HDPE 125 1.707 As per Site
6 HPDE 140 0.030 As per Site
7 HDPE 160 1.183 As per Site
HSC Connection
Sno. Total Nos.
Other Details
2.57
2.69
2.69
31-Aug-2023
01-Sep-2023