| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20025887 | Name of Scheme: BILAUNA | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 2560 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 30-Apr-2025 | Actual Date of Completion (Capex): 26-Aug-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Deep tube well (550LPM) | 25.9/124.5 | BILAUNA | 25.936249 | 80.584516 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 12.5 HP | 550LPM/56Mtr | BILAUNA | 25.936249 | 80.584516 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OVER Head Tank | 150KL/12 Mtr | BILAUNA | 25.936249 | 80.584516 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-9 | 100 | .03 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 63 | 3.108 | |
| 2 | HDPE PIPE | 75 | 0.762 | |
| 3 | HDPE PIPE | 160 | 2.132 | |
| 4 | HDPE PIPE | 110 | 0.230 | |
| 5 | HDPE PIPE | 90 | 0.529 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 540 |