Project Completion Certificate (Ground Water)
Scheme ID: 20025887 Name of Scheme: BILAUNA No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2560 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 30-Apr-2025 Actual Date of Completion (Capex): 26-Aug-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Deep tube well (550LPM) 25.9/124.5 BILAUNA 25.936249 80.584516
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 12.5 HP 550LPM/56Mtr BILAUNA 25.936249 80.584516
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OVER Head Tank 150KL/12 Mtr BILAUNA 25.936249 80.584516
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-9 100 .03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 63 3.108
2 HDPE PIPE 75 0.762
3 HDPE PIPE 160 2.132
4 HDPE PIPE 110 0.230
5 HDPE PIPE 90 0.529
HSC Connection
Sno. Total Nos.
1 540
Other Details
198.29
197.07
200.52
28-Mar-2025
29-Mar-2025