Project Completion Certificate (Ground Water)
Scheme ID: 20026049 Name of Scheme: DARIYAPUR WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 24
Total Population Covered: 4490 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 28-Sep-2023 Actual Date of Completion (Capex): 26-Jun-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 30.17/ 75.47 BARSAT 26º 18' 7.286" N 82º 34' 21.757" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump 45 /42 BARSAT 26º 18' 7.286" N 82º 34' 21.757" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC-Zink Alum Tank 200/12 BARSAT 26º 18' 7.286" N 82º 34' 21.757" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 150 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 19.098
2 HDPE Pipe PN-6: Class PE-100 75 5.885
3 HDPE Pipe PN-6: Class PE-100 90 2.564
4 HDPE Pipe PN-6: Class PE-100 110 0.723
5 HDPE Pipe PN-6: Class PE-100 140 0.359
6 HDPE Pipe PN-6: Class PE-100 160 0.761
7 HDPE Pipe PN-6: Class PE-100 200 0.343
HSC Connection
Sno. Total Nos.
1 600
Other Details
2.06
0.00
0.00
09-Oct-2026
10-Oct-2026