Project Completion Certificate (Ground Water)
Scheme ID: 20026146 Name of Scheme: KANDRIYAWAN WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 6
Total Population Covered: 4420 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 28-Sep-2023 Actual Date of Completion (Capex): 02-Jul-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 24.04/77.29 Kandriyawan 26º 34' 36.007" N 82º 20' 18.24" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump 39/44 Kandriyawan 26º 34' 36.007" N 82º 20' 18.24" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC-Zink Alum Tanak 175/12 Kandriyawan 26º 34' 36.007" N 82º 20' 18.24" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.04
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 3.168
2 HDPE Pipe PN-6: Class PE-100 75 9.135
3 HDPE Pipe PN-6: Class PE-100 110 0.589
4 HDPE Pipe PN-6: Class PE-100 125 0.707
5 HDPE Pipe PN-6: Class PE-100 160 0.9174
HSC Connection
Sno. Total Nos.
1 538
Other Details
2.25
0.00
0.00
27-Oct-2026
28-Oct-2026