Project Completion Certificate (Ground Water)
Scheme ID: 20026268 Name of Scheme: DARI BUZURG No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3660 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 25-Mar-2024 Actual Date of Completion (Capex): 23-Jan-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 550LPM 12.18/50.05 DARI BUJURG 26.123307 80.42074
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 12.5HP Submersible Pump 550LPM/55MTR DARI BUJURG 26.123307 80.42074
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Elevated Storage Reservoir 150 KL/14 MTR DARI BUJURG 26.123307 80.42074
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 MM K-7 100 0.031
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6 CLASS PE-100 63 4.86
2 HDPE PIPE PN-6 CLASS PE-100 75 1.32
3 HDPE PIPE PN-6 CLASS PE-100 90 0.59
4 HDPE PIPE PN-6 CLASS PE-100 110 0.66
5 HDPE PIPE PN-6 CLASS PE-100 125 0.38
6 HDPE PIPE PN-6 CLASS PE-100 160 0.71
7 HDPE PIPE PN-6 CLASS PE-100 180 0.03
HSC Connection
Sno. Total Nos.
1 525
Other Details
2.30
2.29
2.29
23-Jan-2025
24-Jan-2025