Project Completion Certificate (Ground Water)
Scheme ID: 20026423 Name of Scheme: Binayakpupr No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 2550 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 22-Sep-2023 Actual Date of Completion (Capex): 23-Jul-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 21.06 Mtr/74.41 Mtr Binayakpur 26.572810* 79.224761*
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 33.01 (M^3/Hr )/51 Mtr Binayakpur 26.572810* 79.224761*
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150 KL /18 Mtr Binayakpur 26.572810* 79.224761*
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.254
2 HDPE 75 1.508
3 HDPE 90 0.680
4 HDPE 110 .501
5 HDPE 140 1.089
6 HDPE 160 0.810
7 HDPE 180 0.664
HSC Connection
Sno. Total Nos.
1 412
Other Details
1.93
2.02
2.02
23-Jul-2024
24-Jul-2024