| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20026430 | Name of Scheme: Shivpuri Timaruwa PWS | No. of Villages: 3 | No. of Habitation Covered: 7 |
| Total Population Covered: 5460 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 22-Sep-2023 | Actual Date of Completion (Capex): 15-Mar-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 27.08/170.22 MTR | SHIVPURI TIMRAUWA | 29.947201 | 79.072825 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBERMERSIBLE | 72(M3/HR.)/56 MTR | SHIVPURI TIMRAUWA | 29.947201 | 79.072825 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 350 KL / 18 MTR | SHIVPURI TIMRAUWA | 29.947201 | 79.072825 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I | 200 | 0.030 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 4.716 | |
| 2 | HDPE | 75 | 2.452 | |
| 3 | HDPE | 90 | 1.346 | |
| 4 | HDPE | 110 | 3.417 | |
| 5 | HDPE | 140 | 0.978 | |
| 6 | HDPE | 180 | 3.027 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |