| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20030817 | Name of Scheme: DARUNPUR WATER SUPPLY SCHEME | No. of Villages: 3 | No. of Habitation Covered: 10 |
| Total Population Covered: 4060 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 25-Feb-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 300 | 56.58/6 | Darunpur | 25.777555 | 82.381388 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 15HP | 801/43 | Darunpur | 25.777555 | 82.381388 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 225KL/12m | Darunpur | 25.777582 | 82.381223 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7 | 150 | 0.037 | Yes |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | PN-6 | 90 | 0.924 | Yes |
| 2 | PN-6 | 75 | 2.95 | Yes |
| 3 | PN-6 | 63 | 8.929 | Yes |
| 4 | PN-6 | 110 | 0.882 | Yes |
| 5 | PN_6 | 125 | 0.156 | Yes |
| 6 | PN-6 | 140 | 0.228 | Yes |
| 7 | PN-6 | 180 | 0.024 | Yes |
| 8 | PN-6 | 200 | 0.303 | Yes |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 419 |