Project Completion Certificate (Ground Water)
Scheme ID: 20031466 Name of Scheme: Manava Rasoolabad No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 2510 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 23-Sep-2022 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 14.07/77.57 Manava Rasoolabad 26.660686 79.921544
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 35.64/61 Manava Rasoolabad 26.660686 79.921544
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/18 Manava Rasoolabad 26.660686 79.921544
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.020 As per Site
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.20 As per Site
2 HDPE 75 0.63 As per Site
3 HDPE 110 1.45 As per Site
4 HDPE 125 0.23 As per Site
5 HDPE 160 0.32 As per Site
HSC Connection
Sno. Total Nos.
1 455
Other Details
1.87
2.11
2.17
31-Mar-2024
01-Apr-2024