Project Completion Certificate (Ground Water)
Scheme ID: 20033755 Name of Scheme: AMEDA WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 7
Total Population Covered: 4190 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 21-Oct-2023 Actual Date of Completion (Capex): 17-Aug-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of Tubewell Assembly 54.16/36.04 AMEDA 26.524713 82.579795
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Ac Submersible Pump 15 HP 0.09/42 AMEDA 26.524713 82.579795
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 250 kL/12 M AMEDA 26.524713 82.579795
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 150 0.019
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6;Class PE-100 90 1.293
2 HDPE PIPE PN-6;Class PE-100 75 1.775
3 HDPE PIPE PN-6;Class PE-100 63 13.409
4 HDPE PIPE PN-6;Class PE-100 110 2.753
5 HDPE PIPE PN-6;Class PE-100 125 0.403
6 HDPE PIPE PN-6;Class PE-100 140 0.765
7 HDPE PIPE PN-6;Class PE-100 160 0.412
8 HDPE PIPE PN-6;Class PE-100 200 0.046
HSC Connection
Sno. Total Nos.
1 710