Project Completion Certificate (Ground Water)
Scheme ID: 20033763 Name of Scheme: ANTANGI WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 5650 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 21-Oct-2023 Actual Date of Completion (Capex): 09-Aug-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well assembly 22.02/113.81 Antangi 26.336553 82.548067
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 AC submersible 72.28/44 Antangi 26.336555 82.548069
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 350/14 Antangi 26.336551 82.548065
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe k7 200 28
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 90mm Dia HDPE Pipe 90 0.91
2 75mm Dia HDPE Pipe 75 1.36
3 63mm Dia HDPE Pipe 63 20.81
4 110mm Dia HDPE Pipe 110 1.55
5 140mm Dia HDPE Pipe 140 1.90
6 160mm Dia HDPE Pipe 160 0.28
HSC Connection
Sno. Total Nos.
1 697
Other Details
4.01
3.97
3.97
09-Aug-2026
10-Aug-2026