Project Completion Certificate (Ground Water)
Scheme ID: 20034146 Name of Scheme: Barampur Gram Panchayat Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2737 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 05-Dec-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tibe Well 30.05/156.37 Barampur 29.574508 78.199517
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 550/50 Barampur 29.574508 78.199517
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175/12 Barampur 29.574508 78.199517
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 100 0.040
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 63 6.011
2 HDPE 75 0.232
3 HDPE PIPE 90 0.514
4 HDPE PIPE 110 0.213
HSC Connection
Sno. Total Nos.
1 514
Other Details
1.96
0.00
2.03
05-Jun-2026
06-Jun-2026