| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20034290 | Name of Scheme: SHAHJAHANPUR NINAYAN | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 3955 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 24-Nov-2022 | Actual Date of Completion (Capex): 23-Nov-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well | 24/181.50 | Shahjhanpur Ninayan | 26.328641 | 80.079453 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 65.10/60 | Shahjhanpur Ninayan | 26.328641 | 80.079453 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 225/12 | Shahjhanpur Ninayan | 26.328641 | 80.079453 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.016 | As per Site |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 12.167 | As per Site |
| 2 | HDPE | 75 | 0.800 | As per Site |
| 3 | HDPE | 90 | 2.350 | As per Site |
| 4 | HDPE | 110 | 0.825 | As per Site |
| 5 | HDPE | 140 | 0.423 | As per Site |
| 6 | HDPE | 160 | 0.057 | As per Site |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |