Project Completion Certificate (Ground Water)
Scheme ID: 20035265 Name of Scheme: KEWTALA WSS No. of Villages: 1 No. of Habitation Covered: 9
Total Population Covered: 500 Base Year: 2023 Intermediate Year: 2033 Design Year: 2053
Date of Completion (As per Contract): 21-Oct-2023 Actual Date of Completion (Capex): 08-Jul-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 23/75.8 KEWTALA 26°31'32.79"N 82°51'25.79"E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VTPump 51/42 KEWTALA 26°31'32.79"N 82°51'25.79"E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC-Zink ALum Tank 250/12 KEWTALA 26°31'32.79"N 82°51'25.79"E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 150 0.04
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 11.238
2 HDPE Pipe PN-6: Class PE-100 75 5.347
3 HDPE Pipe PN-6: Class PE-100 90 1.714
4 HDPE Pipe PN-6: Class PE-100 110 1.96
5 HDPE Pipe PN-6: Class PE-100 140 0.945
6 HDPE Pipe PN-6: Class PE-100 160 1.955
7 HDPE Pipe PN-6: Class PE-100 180 0.768
8 HDPE Pipe PN-6: Class PE-100 200 0.777
HSC Connection
Sno. Total Nos.
1 600
Other Details
3.07
0.00
0.00
21-Oct-2026
22-Oct-2026