Project Completion Certificate (Ground Water)
Scheme ID: 20035277 Name of Scheme: SHAHPUR AURAM WSS No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 3320 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 21-Oct-2023 Actual Date of Completion (Capex): 27-Aug-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18/64.8 SHAHPUR AURAM 26º 26' 24.366" N 82º 53' 1.442" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VTPump 27/45 SHAHPUR AURAM 26º 26' 24.366" N 82º 53' 1.442" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC-Zink Alum Tank 150/14 SHAHPUR AURAM 26º 26' 24.366" N 82º 53' 1.442" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.04
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 8.005
2 HDPE Pipe PN-6: Class PE-100 75 0.962
3 HDPE Pipe PN-6: Class PE-100 90 0.209
4 HDPE Pipe PN-6: Class PE-100 110 0.843
5 HDPE Pipe PN-6: Class PE-100 125 0.363
6 HDPE Pipe PN-6: Class PE-100 140 0.590
7 HDPE Pipe PN-6: Class PE-100 160 0.559
HSC Connection
Sno. Total Nos.
1 250
Other Details
1.74
0.00
0.00
12-Dec-2025
13-Dec-2025