| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20035721 | Name of Scheme: BAHUAR KHURD WATER SUPPLY SCHEME | No. of Villages: 3 | No. of Habitation Covered: 4 |
| Total Population Covered: 2280 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 30-Apr-2024 | Actual Date of Completion (Capex): 14-Mar-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | MSERW PLAIN PIPE-200 MM | 36.8 | BAHUWAR KHURD | 27.365567 | 83.803516 |
| 2 | MSERW PLAIN PIPE-150 MM | 67.89 | BAHUWAR KHURD | 27.365567 | 83.803516 |
| 3 | MSERW SLOTTED PIPE-150 MM | 15 | BAHUWAR KHURD | 27.365567 | 83.803516 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 29.99/37 | BAHUWAR KHURD | 27.365547 | 83.803743 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | ZINC ALM OHT | 150KL/12M | BAHUWAR KHURD | 27.365716 | 83.803689 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DOUBLE FLANGE DI-K9 | 150 | 0.0246 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | PN-6/PE-100/HDPE | 63 | 3.73 | |
| 2 | PN-6/PE-100/HDPE | 75 | 0.715 | |
| 3 | PN-6/PE-100/HDPE | 90 | 0.178 | |
| 4 | PN-6/PE-100/HDPE | 110 | 0.085 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 291 |