Project Completion Certificate (Ground Water)
Scheme ID: 20035975 Name of Scheme: KAMTA WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2730 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-Apr-2024 Actual Date of Completion (Capex): 31-Dec-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 MSERW Plain Pipe DIA-200MM 36.06 KAMTA 27.201527 83.741747
2 MSERW Plain Pipe DIA-150MM 65.26 KAMTA 27.201527 83.741747
3 MSERW SLOTTED PIPE DIA-150MM 18.02 KAMTA 27.201527 83.741747
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 35.99/39 KAMTA 27.201527 83.741747
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 ZINC ALM OHT 175KL/14M KAMTA 27.201527 83.741747
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DOUBLE FLANGE DI-K9 150 0.0253
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PN-6/PE-100/HDPE 63 1.091
2 PN-6/PE-100/HDPE 75 2.041
3 PN-6/PE-100/HDPE 90 0.300
4 PN-6/PE-100/HDPE 110 0.531
5 PN-6/PE-100/HDPE 125 0.473
6 PN-6/PE-100/HDPE 140 1.505
7 PN-6/PE-100/HDPE 160 0.439
8 PN-6/PE-100/HDPE 180 0.367
HSC Connection
Sno. Total Nos.
Other Details
2.01
0.00
2.01
31-Mar-2026
01-Apr-2026