Project Completion Certificate (Ground Water)
Scheme ID: 20036973 Name of Scheme: Ramapur Multi GP Water Supply Scheme No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 4520 Base Year: 2022 Intermediate Year: 2037 Design Year: 2022
Date of Completion (As per Contract): 31-Dec-2026 Actual Date of Completion (Capex): 17-Jan-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 99/36 Ramapur 82.492611 25.29161
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 61.69 Ramapur 82.492611 25.29161
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT - ZnAl 300/16 Ramapur 82.492611 25.29161
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 200 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 9.632
2 HDPE 75 1.268
3 HDPE 90 0.533
4 HDPE 110 0.955
5 HDPE 140 1.944
6 HDPE 160 0.451
7 HDPE 200 1.055
HSC Connection
Sno. Total Nos.
1 446
Other Details
2.71
3.29
3.29
30-Dec-2025
01-Jan-2026