Project Completion Certificate (Ground Water)
Scheme ID: 20038720 Name of Scheme: BANTHARA PWS No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 1448 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 09-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 6 m/ 114.33 m Banthara 26.817 79.5351
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 950 LPM/ 51M Banthara 26.817 79.5351
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 275 KL/ 14M Banthara 26.817 79.5351
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.074
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 140 0.372
2 HDPE 125 1.124
3 HDPE 110 1.406
4 HDPE 90 1.188
5 HDPE 63 7.527
HSC Connection
Sno. Total Nos.
1 1030
Other Details
1.48
0.00
0.00
08-Sep-2024
10-Sep-2024