Project Completion Certificate (Ground Water)
Scheme ID: 20039030 Name of Scheme: SINGHPUR WAMANA PWS No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 4809 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 01-Jun-2022 Actual Date of Completion (Capex): 11-Apr-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 25 M / 253.34 M SINGHPUR 26.71332 79.650269
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1050 LPM / 53 M SINGHPUR 26.71332 79.650269
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 300 KL/ 16 M SINGHPUR 26.71332 79.650269
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0085
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.3264
2 HDPE 90 4.7607
3 HDPE 110 1.0655
4 HDPE 125 1.0378
5 HDPE 140 0.362
6 HDPE 200 1.8625
HSC Connection
Sno. Total Nos.
1 623
Other Details
3.82
0.00
3.90
10-Apr-2025
12-Apr-2025