Project Completion Certificate (Ground Water)
Scheme ID: 20039855 Name of Scheme: Sondhemau PWS No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 4149 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 20-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 27.17 m / 85.29 m Sondhemau 26.515316 79.601181
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 850 lpm / 49 m Sondhemau 26.515316 79.601181
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.019
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 8.006
2 HDPE 90 2.493
3 HDPE 110 1.857
4 HDPE 125 1.315
5 HDPE 140 3.093
HSC Connection
Sno. Total Nos.
1 755
Other Details
3.12
0.00
0.00
19-Mar-2025
21-Mar-2025