Scheme ID: 20041597 Name of Scheme: CHILVANIA WSS No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2760 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 23-Nov-2023 Actual Date of Completion (Capex): 28-Jul-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 18.04/74.73 CHILVANIA 26º 18' 34.632" N 82º 46' 4.912" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VTPump-1 24/42 CHILVANIA 26º 18' 34.632" N 82º 46' 4.912" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC Zink Alum Tank 100/12 CHILVANIA 26º 18' 34.632" N 82º 46' 4.912" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.040
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 1.892
2 HDPE Pipe PN-6: Class PE-100 75 0.726
3 HDPE Pipe PN-6: Class PE-100 90 0.347
4 HDPE Pipe PN-6: Class PE-100 110 0.544
5 HDPE Pipe PN-6: Class PE-100 140 0.484
HSC Connection
Sno. Total Nos.
1 170
Other Details
1.44
0.00
1.43
12-Oct-2025