Project Completion Certificate (Ground Water)
Scheme ID: 20041711 Name of Scheme: KAHI WSS No. of Villages: 1 No. of Habitation Covered: 7
Total Population Covered: 6840 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Mar-2024 Actual Date of Completion (Capex): 05-May-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 36/64.82 Kahi 26º 27' 56.678" N 82º 18' 41.004" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VTPump 690/45 Kahi 26º 27' 56.678" N 82º 18' 41.004" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC-Zink Alum 325/14 Kahi 26º 27' 56.678" N 82º 18' 41.004" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 150 0.04
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 28.873
2 HDPE Pipe PN-6: Class PE-100 75 1.191
3 HDPE Pipe PN-6: Class PE-100 90 2.638
4 HDPE Pipe PN-6: Class PE-100 110 0.469
5 HDPE Pipe PN-6: Class PE-100 140 1.241
6 HDPE Pipe PN-6: Class PE-100 160 .785
7 HDPE Pipe PN-6: Class PE-100 180 0.494
8 HDPE Pipe PN-6: Class PE-100 200 1.023
HSC Connection
Sno. Total Nos.
1 1028
Other Details
441.37
0.00
0.00
29-Aug-2026
30-Aug-2026