| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20043846 | Name of Scheme: Khadara | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 2985 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 27-Nov-2023 | Actual Date of Completion (Capex): 20-Mar-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 16.03/88.8 | Khadra | 26.157185 | 80.547531 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERCIBLE PUMP | 610/55 | Khadra | 26.157185 | 80.547531 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 175/12 | Khadra | 26.157185 | 80.547531 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D I K7 | 100 | 0.037 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 5525 | |
| 2 | HDPE | 75 | 309 | |
| 3 | HDPE | 90 | 727.29 | |
| 4 | HDPE | 90 | 371.25 | |
| 5 | HDPE | 140 | 583.5 | |
| 6 | HDPE | 160 | 69 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 717 |