Project Completion Certificate (Ground Water)
Scheme ID: 20045132 Name of Scheme: Budhve WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 2187 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 17-Apr-2024 Actual Date of Completion (Capex): 02-Feb-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Slotted Pipe 150mm 24 TW 25.95385 83.6266891
2 Plain Pipe 150mm 130.73 TW 25.95385 83.6266891
3 Plain Pipe 200mm 42 TW 25.95385 83.6266891
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Solar Submersible Pump 500/45 TW 25.95385 83.6266891
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Zinc Tank 150/12 OHT 25.95385 83.6266891
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 200 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 4.31
2 HDPE Pipe PN-6: Class PE-100 75 0.284
3 HDPE Pipe PN-6: Class PE-100 90 0.65
4 HDPE Pipe PN-6: Class PE-100 110 0.36
5 HDPE Pipe PN-6: Class PE-100 125 0.2
6 HDPE Pipe PN-6: Class PE-100 140 0.11
7 HDPE Pipe PN-6: Class PE-100 180 0.073
8 HDPE Pipe PN-6: Class PE-100 200 0.089
HSC Connection
Sno. Total Nos.
1 336
Other Details
2.42
1.94
1.75
08-Jul-2025
02-Feb-2026