Scheme ID: 20047883 Name of Scheme: KUSROPUR WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2817 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 15-May-2023 Actual Date of Completion (Capex): 09-Mar-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBE WELL 18.19 / 114.93 KUSROPUR 29.513328 77.579351
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 500 LPM / 48 M KUSROPUR 29.513328 77.579351
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT -1 150KL / 12M KUSROPUR 77.579351 77.579351
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.0236
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 110 .118
2 HDPE 90 1.087
3 HDPE 75 0.70343
4 HDPE 63 3.682
HSC Connection
Sno. Total Nos.
1 550
Other Details
2.36
0.00
1.95
09-Jun-2026
10-Jun-2026