Project Completion Certificate (Ground Water)
Scheme ID: 20048563 Name of Scheme: Kookara Islampur Village Water Supply Scheme No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2715 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 20-Nov-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30.02 / 120.48 KOOKARA ISLAMPUR 29.311654 78.297958
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 550 / 47 KOOKARA ISLAMPUR 29.311654 78.297958
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175 KL / 12 MTR KOOKARA ISLAMPUR 29.311654 78.297958
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.0275
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 63 5.9799
2 HDPE PIPE 75 0.6121
3 HDPE PIPE 90 0.2755
4 HDPE PIPE 110 0.5431
5 HDPE PIPE 125 0.0823
6 HDPE PIPE 140 0.1418
7 HDPE PIPE 160 0.1134
HSC Connection
Sno. Total Nos.
1 503
Other Details
1.95
0.00
1.98
20-May-2025
21-May-2025