| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20049159 | Name of Scheme: MAKHDOOMPUR SINGLE VILLAGE WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 2764 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 31-Dec-2027 | Actual Date of Completion (Capex): 19-Apr-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Solar Powered Pump | 18.09/101.64 | Makhdoompur | 28.958625 | 78.428895 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Solar PowerSolar Powered Pumped Pump | 600/44 | Makhdoompur | 28.958625 | 78.428895 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Cast in situ Zinc Zincalume | 175/12 | Makhdoompur | 28.958738 | 78.429087 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7/DI | 100 | 0.030 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | PN-6 PE100/HDPE | 90 | 0.3343 | |
| 2 | PN-6 PE100/HDPE | 75 | 0.1604 | |
| 3 | PN-6 PE100/HDPE | 63 | 6.2449 | |
| 4 | PN-6 PE100/HDPE | 110 | 174.2 | |
| 5 | PN-6 PE100/HDPE | 125 | 0.1757 | |
| 6 | PN-6 PE100/HDPE | 160 | 0.0806 | |
| 7 | PN-6 PE100/HDPE | 180 | 0.5132 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 516 |