Project Completion Certificate (Ground Water)
Scheme ID: 20049253 Name of Scheme: SUNPURA KALAN SINGLE VILLAGE WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2050 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2027 Actual Date of Completion (Capex): 24-Jun-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Solar Powered Pump 18.13/94.52 Sunpura Kalan 28.85337133 78.17082468
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Solar Powered Pump 450/39 Sunpura Kalan 28.85337133 78.17082468
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Cast in situ Zinc Zincalume 125/12 Sunpura Kalan 28.8533 78.1707
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7/DI 100 0.030 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PN-6 PE100/HDPE 90 0.0532
2 PN-6 PE100/HDPE 75 0.330
3 PN-6 PE100/HDPE 63 2.5548
4 PN-6 PE100/HDPE 110 0.018
5 PN-6 PE100/HDPE 125 0.1116
6 PN-6 PE100/HDPE 140 0.367
7 PN-6 PE100/HDPE 160 0.438
HSC Connection
Sno. Total Nos.
1 477
Other Details
1.38
0.00
0.00
05-Oct-2026
06-Oct-2026