| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20049253 | Name of Scheme: SUNPURA KALAN SINGLE VILLAGE WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 2050 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 31-Dec-2027 | Actual Date of Completion (Capex): 24-Jun-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Solar Powered Pump | 18.13/94.52 | Sunpura Kalan | 28.85337133 | 78.17082468 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Solar Powered Pump | 450/39 | Sunpura Kalan | 28.85337133 | 78.17082468 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Cast in situ Zinc Zincalume | 125/12 | Sunpura Kalan | 28.8533 | 78.1707 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7/DI | 100 | 0.030 | 0.030 |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | PN-6 PE100/HDPE | 90 | 0.0532 | |
| 2 | PN-6 PE100/HDPE | 75 | 0.330 | |
| 3 | PN-6 PE100/HDPE | 63 | 2.5548 | |
| 4 | PN-6 PE100/HDPE | 110 | 0.018 | |
| 5 | PN-6 PE100/HDPE | 125 | 0.1116 | |
| 6 | PN-6 PE100/HDPE | 140 | 0.367 | |
| 7 | PN-6 PE100/HDPE | 160 | 0.438 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 477 |