Project Completion Certificate (Ground Water)
Scheme ID: 20049292 Name of Scheme: JAMUNA KHAS VILLAGE WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 4642 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 11-Apr-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Solar Powered Pump 30.14/108.41 Jamuna Khas 29.028181 78.491687
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Solar Powered Pump 917/46 Jamuna Khas 29.028181 78.491687
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Cast in situ Zinc Zincalume 275/14 Jamuna Khas 29.0299094 78.4927753
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7/DI 150 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PN-6 PE100/HDPE 90 0.1732
2 PN-6 PE100/HDPE 75 0.0841
3 PN-6 PE100/HDPE 63 6.9354
4 PN-6 PE100/HDPE 110 0.100
5 PN-6 PE100/HDPE 125 0.50
6 PN-6 PE100/HDPE 140 0.322
7 PN-6 PE100/HDPE 160 0.1314
HSC Connection
Sno. Total Nos.
1 750
Other Details
2.75
0.00
0.00
21-Aug-2026
22-Aug-2026